Hoy Head

In collaboration with Cammell Laird, the SeaKing Group undertook a sophisticated project on the Hoy Head ferry,
demonstrating our prowess in precision engineering and maritime innovation.

Hoy Head

Summary of Works

  • Electrical System Upgrade 
  • Propulsion and Bow Thruster Installation 
  • Control System Integration 
  • Infrastructure Mapping and Optimisation 

Project Highlights

Vessel Expansion and Upgrade:

  • The project involved the strategic splitting of the ferry in half, with the insertion of a new middle section for enhanced capacity and efficiency.
  • SeaKing’s engineering team executed the intricate task of cutting, upgrading, and reconnecting electrical systems seamlessly via the new section.

Electrical Infrastructure Mapping and Upgrade:

  • Comprehensive mapping of the existing electrical system was conducted to ensure seamless integration with the new section.
  • Infrastructure upgrades were implemented to enhance overall efficiency, driving improvements in the vessel’s electrical capabilities.

Propulsion and Bow Thruster Installation:

  • Installation of a new propulsion engine and propeller unit for enhanced operational performance.
  • Introduction of a new bow thruster to improve manoeuvrability, especially in challenging conditions such as high winds.

Control System Integration:

  • Upgrading control systems to manage the new propulsion engine, propeller unit, and bow thruster seamlessly from the bridge and bow.
  • Installation of a new auto-pilot system for advanced navigation capabilities.

Electrical Installation and Refurbishment:

  • Approximately 60% of the project involved new electrical installations, showcasing SeaKing’s capacity for precision electrical engineering.
  • Refurbishment work, constituting 40% of the project, focused on optimizing the existing electrical system for enhanced performance.

Fire Detection Panel and Systems Restoration:

  • Installation of a state-of-the-art fire detection panel to bolster safety measures on the vessel.
  • Temporary removal of radio and navigation systems to facilitate interior repainting, followed by meticulous re-installation.

Engineering Excellence in Maritime Innovation: :

  • The ‘Hoy Head’ project exemplifies SeaKing Group’s commitment to engineering excellence in maritime innovation.
  • Precision in electrical mapping, strategic infrastructure upgrades, and seamless integration of new components showcase our expertise in ferry enhancement.

Navigating the Future of Maritime Excellence: 

SeaKing’s role in the ‘Hoy Head’ project reinforces our position as a leader in maritime engineering, steering vessels toward a future of enhanced efficiency and operational brilliance.